Contract fabrication

Contract steel fabrication single parts, prototypes and small batches to drawing

We make steel, stainless steel and aluminium parts to your drawing: TIG and MIG/MAG welding, plasma cutting, threading and blasting in our own plant in Poland; laser cutting, CNC bending, powder coating and galvanising through trusted partners — from prototype to series.

01 Capabilities

MaterialsStructural steel S235 / S355, stainless steel 1.4301 / 1.4404 (304 / 316L), aluminium 5754, 5083, 6060, 6063, 6061, 6082
Cutting and formingCNC cutting and press braking
WeldingTIG (aluminium from 1 mm, stainless steel), MIG/MAG
ThreadsCNC threading, Helicoil thread inserts
FinishingBlasting Sa 2½, powder coating RAL 60–100 µm, hot-dip galvanised versions
Tolerance on welded frames±1 mm
Batch sizessingle part, prototype, small batch
Lead timesimple frames 5–10 working days, TIG welding jobs 3–10 days from order confirmation

02 Typical parts

Machine frames and racks

Welded frames for machines and installations in S235 / S355 or stainless steel.

More

Brackets and holders

Single parts and small batches to drawing, coated in a RAL colour.

Welded aluminium parts

TIG-welded aluminium from 1 mm wall thickness.

Railings and stairs

Stainless steel 304 / 316L and steel stairs made to measure.

03 Process

  1. Request

    Drawing (PDF, DXF, DWG, STEP, IGES), quantity, annual demand, material, finish, due date.

  2. Reply within 24 h

    Net price, lead time, Incoterms.

  3. Production

    Welding and blasting in our own plant, cutting and coating with partners.

  4. Delivery

    DAP or FCA Lądek.

FAQ Frequently asked questions

Which file formats can I send?

PDF, DXF, DWG, STEP and IGES; photos as JPG. The request form accepts attachments up to 50 MB in total.

Which materials do you work with?

Structural steel S235 and S355, stainless steel 1.4301 and 1.4404 (304 / 316L) and aluminium alloys 5754, 5083, 6060, 6063, 6061 and 6082.

How long does production take?

Simple welded frames 5–10 working days, TIG welding jobs 3–10 days from order confirmation. The exact date is stated in the quote.

POWERED BY:

Website development and optimisation.

synaptIQ is part of B.S.G Sp. z o.o.

Message us on WhatsApp
💬 Questions? Message us.