Welded steel structures frames, racks and brackets in steel, stainless steel and aluminium
We weld frames and racks for machines and installations in structural steel S235 / S355, stainless steel 304 / 316L and aluminium, to a ±1 mm tolerance. Simple frames take 5–10 working days and can be supplied blasted and powder coated.
01 Technical data
| Materials | S235, S355, stainless steel 304 / 316L, aluminium |
|---|---|
| Processes | MIG/MAG, TIG |
| Tolerance | ±1 mm |
| Finish | blasting Sa 2½, RAL powder coating, wet paint |
| Lead time | simple frames 5–10 working days |
| Warranty | 24 months on workmanship and coating |
02 See also
FAQ Frequently asked questions
What tolerance do you hold on welded frames?
±1 mm.
How long does a simple frame take?
5–10 working days from order confirmation.
Can frames be delivered coated?
Yes — blasted to Sa 2½ and powder coated in the RAL colour of your choice.